julesmay
31-08-06, 08:47
roger vitko- head guy for tunze usa has posted that they envisage a slight delay, and realistically looking at mid october for nanostreams-
"The problem is the safety certifications have met with delays as the guy in charge of certifying the product is on vacation and until he can inspect the factory, full scale production with the German safety (GS) marks is not possible. It looks like the US ETL safety mark is still on schedule but we want the product to be available in all markets virtually simultaneously."
so based on the above it looks like u.k. may also have to wait for Herr tunze inspector to finish his holidaying.
"The problem is the safety certifications have met with delays as the guy in charge of certifying the product is on vacation and until he can inspect the factory, full scale production with the German safety (GS) marks is not possible. It looks like the US ETL safety mark is still on schedule but we want the product to be available in all markets virtually simultaneously."
so based on the above it looks like u.k. may also have to wait for Herr tunze inspector to finish his holidaying.